Starting construction without the right groundwork is the single biggest cause of cost overruns and delays. Before you break ground, make sure these five items are locked down.

1. Soil Testing

A proper geotechnical survey determines your foundation design. Skipping this is one of the most expensive mistakes a builder can make.

2. Statutory Approvals

Building permissions, environmental clearances and layout approvals should be in hand before mobilisation — not chased mid-construction.

3. A Fixed Scope of Work

Ambiguous drawings lead to disputes later. Insist on a detailed bill of quantities before signing a contract.

4. A Realistic Timeline

Factor in monsoon months, material lead times and approval cycles — not just construction days.

5. A Single Point of Accountability

Multiple uncoordinated contractors is the fastest route to finger-pointing when something goes wrong. One accountable team changes everything.